Wednesday, January 20, 2021

HSR Thailand - Bina Puri raih kontrak RM 1.036b


Bina Puri raih kontrak HSR Thailand

November 26, 2020

Bina Puri Holdings Bhd (Bina Puri), menerusi syarikat usaha samanya, SPTK Joint Venture Co Ltd (SPTK JV) memeterai pakej kontrak dengan State Railway of Thailand (SRT) membabitkan projek Kereta Api Berkelajuan Tinggi (HSR) yang menghubungkan Bangkok ke Nakhon Ratchasima.

Anak syarikat milik penuh Bina Puri, Bina Puri Sdn Bhd (BPSB) serta NPA Construction Co Ltd dan Tim Sekata Sdn Bhd memenangi bidaan bagi pakej bernilai 7.75 bilion baht (RM1.036 bilion) bagi bahagian Khok Kruat–Nakhon Ratchasima di bawah fasa pertama bahagian Bangkok-Nakhon Ratchasima.

Kontrak itu ditandatangani Ketua Pegawai Eksekutif SPTK JV, Attasith Damrongrat dan Pengarah Eksekutif Bina Puri Holdings (Thailand) Ltd, Leong Keh Soon bagi pihak SPTK JV, manakala SRT diwakili oleh gabenornya, Nirut Maneephan.

Setiausaha Tetap Kementerian Pengangkutan, Chayatham Phromsorn, menyaksikan majlis pemeteraian itu yang diadakan di kementerian berkenaan di Bangkok.

Hadir sama Pengarah Urusan NPA Construction Co Ltd Dittapol Damrongrat, Pesuruhjaya Perdagangan Perbadanan Pembangunan Perdagangan Luar Malaysia (MATRADE), Norman Dzulkarnain Nasri dan Pengerusi Dewan Perniagaan Malaysia-Thailand (MTCC), Dr Hwee Khim Boo.

 

Kerja-kerja sivil untuk fasa pertama bahagian Bangkok-Nakhon Ratchasima membabitkan 14 kontrak. Majlis pemeteraian hari ini membabitkan lima kontrak bagi kerja-kerja sivil.

Sementara itu, Attasith berkata, SPTK JV yakin berupaya menyiapkan projek itu mengikut masa ditetapkan.

"Kami mempunyai tenaga kerja yang mencukupi dan sub-kontraktor untuk menyelesaikan projek ini. Kami juga mempunyai jurutera untuk memantau projek ini pada setiap bulan," katanya.

Projek HSR Bangkok-Nong Khai mempunyai dua fasa dengan pembinaan bahagian Bangkok-Nakhon Ratchasima (fasa pertama) akan membabitkan landasan kereta api sepanjang 250.77 kilometer (km) dengan anggaran kos pembinaan sebanyak 179.41 bilion baht (RM24.1 bilion) manakala fasa kedua pula dengan pembinaan landasan sepanjang 356.10 km bagi bahagian Nakhon Ratchasima-Nong Khai.

Bina Puri meneroka pasaran Thailand untuk kali pertama pada 2003 apabila menerima kontrak membina akses jalan ke Lapangan Terbang Antarabangsa Suvarnabhumi, Bangkok yang bernilai melebihi RM180 juta.

-- BERNAMA

READ ALSO : THAILAND HSR; KL SENTRAL HUB TRANSPORTATION




Monday, January 11, 2021

LRT Kerinchi KJ18 - Link To Menara Telekom, Bangsar South

LRT KJ18 KERINCHI is located at Pantai under Federal Territory. The nearest city is Petaling Jaya, Bangsar and most crowded people at Pantai Dalam. Started its operation in September 1998, this unique design whereby build inside the building, similar to LRT KL Sentral


LRT Kerinchi side platform design


Platform Design - side platform design. Platform towards LRT Gombak and platform 2 to Putra Heights

This LRT is closest way to Menara Telekom, new develop Bangsar South, Plaza Pantai and Pantai Medical Centre many commercial area. Started its operation and revenue in September 1998, LRT Kerinchi crucial important to various society.






MOOVITAPP  - How to get to KL 1100 LRT Kerinchi,Jalan 4 / 93A in Kuala Lumpur by Subway, Bus, Train

Facilities and amenities:

  • Toilet and prayer rooms
  • Lift and escalator
  • Ticket / token selling
  • Touch and Go top-up
  • OKU textiles and friendly user to OKU
  • Feeder bus and bus stop
  • Download Prasarana Journey Planner
There are schools closed to LRT Kerinchi;

1. Sekolah Kebangsaan Bangsar


2. Sri Dasmesh International School.


LRT Kerinchi concourse level


Pathway to Menara Telekom


Pathway to Menara Telekom



A 4 coach train with Menara Telekom building

Pathway to Bangsar South

LRT Kerinchi is the easiest way to Bangsar South. Another option is go to LRT Universiti which just one more stop from here 

Bridge to Bangsar South



Bangsar South New Commercial area in Kerinchi

Bangsar South New Develope Area in Kerinchi




Entrance A

Pathway to main road from Jalan Pantai Baru and Federal Highway attractions:

1. PaK Abu Sup Ekor best sup ekor LRT Kerinchi area

Address: No 8, AB/2, Jalan Pantai Baharu, 59200 Kuala Lumpur.


FB- Sup Ekor Pak Abu LRT Kerinchi


FB - Pak Abu Sup Ekor


FB - Pak Abu Sup Ekor

2. University Malaya R&D Complex


3. Restoran Haslam - new attarction

Address: Jalan Pantai Baharu, Bangsar, 59100 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur


Bus stop waiting area




READ ALSO : LRT KLCC TO SURIA AND PETRONAS TOWER:  



LRT KL SENTRAL

As mention earlier Bangsar South is new development area and growth rapidly with many prime organization occupied the area. There are many commuters who travel to office to avoid high cost of driving

Thursday, January 7, 2021

LRT Abdullah Hukum Connecting to KTM and KL Eco City Shopping Mall


 
Located at Bangsar area, LRT Abdullah Hukum KJ17 was opened in 1998 with strategic place where its neighbouring Lembah Pantai, Petaling Jaya. Rapidly develop on top of Kampung Haji Abdullah Hukum area, there many new shopping mall, Eco city and Mid Valley mega mall around this LRT station.


LRT Abdullah Hukum Entrance

LRT Abdullah Hukum KJ17 have 2 side of entrance
  1. New Pantai Expressway (NPE) and TNB side 
  2. Underneath the station, Ecocity side






Google's  map LRT location 




Main Entrance Station Open and Close Schedule


READ ALSO : PRASARANA JOURNEY PLANNER  ; KL SENTRAL HUB


LRT concourse area


Info on KTM connecting to LRT, MRT

Commercial Attractions 



Pathway from KTM to LRT and vice versa 

KTM Entrance from Eco City

One of pathway to KL Eco City shopping mall

KTM gates to the platform



READ ALSO :










Tuesday, January 5, 2021

LRT Dato Keramat KJ7 UTC and exploring other area


LRT Dato Keramat KJ7 is located at Jalan Keramat, near Dato' Keramat, besides AKLEH highway and  Sungai Klang,  opened in 1999. The nearest LRT stations is LRT Damai and LRT Jelatek


LRT Dato' Keramat Platform

Build as side platform design station, the LRT name was chosen as its location is nearest to Datuk Keramat area or Titiwangsa community  



Click to see videos from KLTRANSIT TRAVEL CHANNEL



View from LRT Jelatek and to AKLEH Highway

Mini UTC Dato Keramat also not far from the station.





There are lot of shop food at nearest LRT Dato' Keramat. One of it is Roti John Titiwangsa which is located just outside Masjid Al Akram




READ ALSO : ROTI JOHN TITWANGSA




LRT Dato' Keramat's Entrance



LRT Dato' Keramat Bus Stop Area


There are feeder bus at street level of LRT Dato' Keramat and refer to the Journey Planner or download PULSE Prasarana Journey Planner

How to go LRT Dato' Keramat? click Moovit for more connectivity at nearest station

LRT Dato'Keramat Concourse

Click https://www.myrapid.com.my/pulse-journey-planner to plan your journey without hassle

READ ALSO : LRT DANG WANGI, 

LRT KL SENTRAL ;

PRASARANA JOURNEY PLANNER ;

LRT GOMBAK

LRT TAMAN MELATI

LRT KL GATEWAY - UNIVERSITI



LRT Damai KJ8 Easy and Friendly To UTC Dato Keramat Passport Renewal and Government's Agencies

LRT Damai KJ8 is located in Kuala Lumpur city under Rapid Rail Sendirian Berhad has started the revenue in June 1999 is phase 2 project under Prasarana Malaysia Berhad

LRT Damai is a centre platform design

LRT open daily open 6am but the closing time is according to stations. 



Click to view LRT tour on KLTRANSIT TRAVEL CHANNEL YouTube channel.

LRT and Bus Journey Planner Download PULSE for seamless journey

NEAREST PLACES:

1. PUSAT TAHFIZ DARUL HAFIZHIIN

2. PERUMAHAN AWAM SRI PERLIS



Google's location map of LRT Damai KJ8

Google's Map


LRT Damai actually located closed to Mini UTC Dato' Keramat which is at very strategic area. Located in between LRT Ampang Park and LRT Dato' Keramat, the station are link the society with government agencies.





The concourse area where toilet, prayer room, customer service, entrance are located

From the platform of LRT Damai, you can view Mini UTC Dato Keramat

Mini UTC Datuk Keramat 



Mini UTC lobby




Mini UTC  - JPJ office


The bridge is build up to link passengers from LRT to Mini UTC Dato' Keramat to avoid parking issue




LRT Damai KJ8 Parking Space



Under the station, there are shop lot such as 7E for customer convenience


Commercial activities at LRT Damai also can be attracting and non fare income to LRT operator. For example, Kedai Emas Merchant.

In many places like Japan in their rai;l stations. There are a lot of KIOSK and shop lot to support the revenue





From the Moovit website, you can find LRT Damai, click here

Another parking space at station



READ ALSO;



Monday, January 4, 2021

Rayuan Haji Melalui Aplikasi THi Jari

KUALA LUMPUR, 22 Disember 2020 - Para pendeposit TH yang ingin membuat rayuan haji kini boleh menggunakan aplikasi THiJARI. Rayuan haji untuk tahun 1442H/2021M dibuka bermula hari ini 22 Disember 2020 sehingga 13 Februari 2021.

YB Datuk Dr. Zulkifli Al Bakri, Menteri Di Jabatan Perdana Menteri (Hal Ehwal Agama) berkata semasa merasmikan Muzakarah Haji Peringkat Kebangsaan ke-37, kemudahan terbaharu ini dibina bagi membantu orang ramai membuat rayuan haji tanpa perlu menghantar surat rayuan ke pejabat-pejabat TH seperti tahun-tahun yang lalu, lebih-lebih lagi masyarakat kini terkesan dengan penularan wabak Covid-19.



Selain daripada rayuan haji, bakal haji boleh menyemak pendaftaran haji, status rayuan haji, status tawaran haji, jadual penerbangan serta pelbagai perkhidmatan lain seperti urusan simpanan dan pengeluaran melalui aplikasi THiJARI.


RUJUK PANDUAN : CARA MUDAH BUAT RAYUAN HAJI

BACA JUGA :


Tip Berkesan Dalam Pengurusan Kewangan Semasa Covid 19 di Malaysia

Klang Valley Journey Planner

Saturday, January 2, 2021

Kuala Lumpur -Singapore High Speed Rail (HSR) Project Terminated


KUALA LUMPUR, Jan 1 -- The Kuala Lumpur-Singapore High Speed Rail (HSR) project has been terminated, as both countries failed to reach an agreement on changes proposed by Malaysia before the project agreement lapsed on Thursday (Dec 31).

A joint press statement by Malaysian Prime Minister Tan Sri Muhyiddin Yassin and his Singapore counterpart Lee Hsien Loong said the Malaysian government had proposed several changes to the HSR project due to the impact of the COVID-19 pandemic on the Malaysian economy.



"Both governments had conducted several discussions with regard to these changes and had not been able to reach an agreement. Therefore, the HSR Agreement had lapsed on Dec 31, 2020,” it said.

Sources - BERNAMA 

MRT PY06 Sri Damansara Barat More Park N Ride Facilities

MRT PY06 Sri Damansara Barat is a one of station under MRT Putrajaya Line. Started its operation in 16th June 2022, the extension of MRT lin...