Sunday, February 14, 2021

LRT Setiawangsa KJ5 - Loads of Parking Space at Nearest Station

LRT Setiawangsa KJ5

LRT Setiawangsa KJ5 was located on Jalan Jelatek and AU1 Dato' Keramat, under management of Rapid Rail Kelana Jaya Line (line number 5 on Klang Valley Integrated map)


LRT Setiawangsa KJ5 Main Entrance

Started its operation in 1999 under phase 2 of Kelana Jaya Line, LRT Setiawangsa important to support influx from Wangsa Maju area 

Platform design - centre platform.


Platform 1 - to Gombak
Platform 2 - to Putra Heights

LRT Setiawangsa KJ5 Centre Platform

LRT SETIAWANGSA KJ5 - LOCATION ON GOOGLE MAP





KLAV Inovia 300 train


Closed to LRT Jelatek, Wangsa Maju, this LRT station is to support high ridership from surrounding area such as Jelatek, Wangsa Maju, Setiawangsa itself

LRT Setiawangsa track view toward LRT Sri Rampai

There are massive highway construction from the main road


Above video is track view from LRT Ampang Park to Wangsa Maju. Click to watch more LRT, Monorail videos at Kltransit Travel Channel

LRT Setiawangsa KJ 5 Google map 

There a lot of private parking available just outside of station and near the side road. Just park with reasonable rate and ride it

Parking space at LRT Setiawangsa

It is easy to access from parking area to LRT station. If you difficult to find parking space at LRT Jelatek, here is the best option to ride to city.

Kltransit blogspot's photo LRT Setiawangsa

How to go LRT Setiawangsa? - Prasarana Journey Planner shall assist you, just click

LRT Setiawangsa feeder bus waiting area 

READ ALSO ;

LRT GOMBAK KJ1











LRT Jelatek KJ6 - Link to Datuk Keramat area and Datum Jelatek Valuable Property

LRT Jelatek KJ6

LRT Jelatek KJ6 was started its operation in 1999 and is an elevated station with closest to AU1 Datuk Keramat area, in Kuala Lumpur territory. Open daily at 6 am and closed time is according to latest schedule.

Refer to Prasarana Journey Planner and Klang Valley public transport services provider.

LRT Jelatek KJ6 main entrance

LOCATION of LRT Jelatek KJ6

LRT Jelatek KJ6 on google map. The nearest LRT is LRT Dato' Keramat and

LRT Setiawangsa


LRT Jelatek link (future) to Datum Jelatek

There are massive highway development near the main road and adjacent of the LRT station. There are loads of property surrounding of LRT Jelatek. 


Datum Jelatek Have Access to LRT Jelatek


Development of Datum Jelatek details explained in Nu Prop website. There are potential of property business arisen because of its strategic location

Datum Jelatek: Nu Prop website





Click to view KLTRANSIT TRAVEL CHANNEL on LRT tour

PLATFORM - SIDE PLATFORM TYPE ( NUMBER 1 / 2)

It is a side platform station whereby platform 1 and 2 divided by track.

LRT Jelatek platform 2 heading to Putra Heights

Platform 1 is heading to Gombak and platform 2 to Putra Heights

LRT Jelatek customer service counter at fare gates


LRT Jelatek side platform


RELATED INFO :

LRT GOMBAK KJ1 - MULTI LEVEL PARKING

LRT TAMAN MELATI KJ2 - GOMBAK HOUSING AREA

LRT WANGSA MAJU KJ3 - HIGH RIDERSHIP STATION

LRT SRI RAMPAI KJ4 LOADS OF PARKING SPCAE

LRT DATO' KERAMAT KJ7 - ROTI JOHN VIRAL

LRT DAMAI KJ8 - MINI UTC DATO' KERAMAT

LRT AMPANG PARK KJ9 - MODERATE AREA WITH CONNECTION TO MRT 2 PUTRAJAYA LINE

LRT KLCC KJ10 KELANA JAYA LINE PATHWAY TO PETRONAS TOWER AND SURIA KLCC

LRT DANG WANGI KJ 12 - LINKS TO GOLDEN TRIANGLE AND BUKIT NANAS KL MONORAIL

LRT MASJID JAMEK KJ13 - INTEGRATED STATION TO SRI PETALING AND AMPANG LINE

LRT PASAR SENI KJ 14 INTEGRATED TO MRT KAJANG LINE AND KTM KL STATION

LRT KL SENTRAL KJ 15 AIR TERMINAL HUB CONNECTING TO RAIL OPERATORS

LRT BANK RAKYAT - BANGSAR KJ16 LINKS TO LOADS OF OFFICE AND BANGSAR AREA

KTMB websites - FOR SCHEDULE AND TICKETING

KLIA websites - FOR KLIA EXPRESS AND TRANIST SCHEDULE AND TICKETING


Thursday, February 11, 2021

Tip Berkesan Dalam Pengurusan Kewangan Ketika PKP - Langkah Bijak Rakyat Malaysia

Berikutan kesan pandemik Covid19, ekonomi dunia dilanda kemelesatan dan Malaysia adalah antara yang mengalami kesan yang amat teruk. Rakyat negara ini telah diberi bantuan yang minima oleh pihak tertentu, namun sebagai individu anda perlu mempunyai perancangan kewangan yang bijak supaya kesannya dirasai secara minima. 


The Edge Financial Daily, on February 11, 2020.

Edge :Penurunan KDNK Malaysia (Year to Year) Q32019

Ramalan penurunan KDNK berterusan untuk tahun 2020 dan tidak pula menunjukkan peningkatan pada awal Januari 2021. 

5 tip yang boleh digunakan ketika  PKP ini adalah seperti berikut:

1. Kaji semula budget anda

Anda mungkin ingin mengetatkan budget anda untuk memastikan anda mempunyai dana yang mencukupi untuk menampung perbelanjaan, terutamanya jika krisis berlanjutan lebih lama dari yang dijangkakan. Memperuntukkan lebih banyak wang ke dalam dana kecemasan anda juga merupakan idea yang baik - simpan sebanyak yang anda mampu sekarang, kerana ia akan berguna sekiranya keadaan menjadi lebih buruk.

Menetapkan keutamaan juga merupakan idea yang baik supaya anda pasti  mana yang sangat penting dan kurang penting

Membeli insuran juga adalah langkah baik jika anda berkemampuan.

 

2. Dapatkan bantuan sekiranya anda menghadapi masalah kewangan

Sekiranya anda sukar untuk membayar bil anda, jangan lewatkan pembayaran kerana akan mempengaruhi skor kredit (prestasi kewangan) anda. Hubungi pemiutang/ bank anda sebelum laporan atau penyata pembayaran dikelurakan untuk pastikan apakah mereka dapat membantu.

Akibat krisis masa kini, banyak bank dan institusi perkhidmatan kewangan Malaysia telah memperluas program bantuan kewangan mereka yang berterusan untuk membantu meringankan beban kewangan pelanggan mereka. Beberapa bantuan yang ditawarkan termasuk:

• Penyusunan semula / penjadualan semula pembayaran ansuran

• Penangguhan perkhidmatan pembiayaan sehingga 6 bulan

• Permintaan untuk mengetepikan caj lewat untuk pembiayaan

• Penangguhan pembayaran pinjaman sementara

• Penyusunan semula pembayaran ansuran

Oleh kerana setiap bank mempunyai pelbagai jenis bantuan atau nasihat serta terma dan syarat, berunding dengan bank masing-masing untuk mengetahui bagaimana mereka dapat membantu anda secara khusus

 

3. Lakukan semua pembayaran tepat pada waktunya

Pembayaran lewat atau melewatkan pembayaran boleh mempengaruhi skor kredit anda. Cuba buat sekurang-kurangnya pembayaran bulanan minimum anda pada tarikh akhir. Cubalah untuk mengekalkan pembayaran tepat pada masanya walaupun anda hanya mampu membayar minimum

Pembayaran lewat boleh memburukkan lagi keadaan kewangan anda

4. Rujuk pakar kewangan dalam perkara pelaburan

Bagi mereka yang mempunyai pelaburan, simpanan atau akaun persaraan, turun naik pasaran boleh menyebabkan kebimbangan yang ketara. Sebelum anda membuat keputusan tergesa-gesa dengan pelaburan anda, berjumpa dengan pakar kewangan di mana anda patut melabur.

 

5. Pemantauan kredit  yang berterusan.

Tidak kira sama ada anda terlepas pembayaran pada masa lalu atau tidak, anda perlu menguruskan kredit dan menunjukkan bahawa anda mengawalnya. Apabila anda mendapat laporan kredit yang dikemaskini, anda dapat melihat bahagian keadaaan kredit anda yang mana yang perlu diperbaiki, iaitu pembayaran yang anda terlepas dan berapa jumlahnya. Kemudian, anda boleh mula mengambil langkah-langkah untuk menyelesaikan masalah jika diperlukan, dan juga terus memantau prestasi kredit anda.


Saving is The Best Option









Monday, February 8, 2021

RTA completes preventive rail grinding of Dubai Metro

 

RTA completes preventive rail grinding of Dubai Metro


Dubai Metro uses highly advanced preventive maintenance system that uses a sophisticated rail grinder fitted with advanced camera and laser technologies enabling high-precision scanning of rail tracks.

By media office -January 12, 20210572

Roads and Transport Authority, in collaboration with Serco, operator of Dubai Metro and Tram, has recently completed preventive maintenance works for grinding Dubai Metro rail tracks that extend about 300 km.



Dubai Metro uses highly advanced preventive maintenance system that uses a sophisticated rail grinder fitted with advanced camera and laser technologies enabling high-precision scanning of rail tracks. The technology determines the appropriate maintenance system, which ensures the smooth movement of the rolling stock and the optimal utilization of asset lifespan.



READ ALSO;

HSR JAKARTA - BANDUNG HAS COMPLETED 63.9%


Dubai Metro Train

RTA Dubai


Dubaimetro.eu/rta

Prasarana's Juorney Planner - Kuala Lumpur and Klang Valley Public Transport Lover

Hi Kuala Lumpur Travelers,

For smooth journey, you may utilize the journey planner 

1. Moovit Journey Planner - Rail and Bus

2 .Google Play Store

3 .Prasarana PULSE Journey Planner

4. 03 78852585 Rapid KL Hotline


Moovit Journey Planner Sample


Prasarana's Corporate Video



Arriving Train to LRT Bangsar Platform





Rapid KL twitter


READ ALSO;

1. LRT GOMBAK

2. LRT TAMAN MELATI

3. LRT WANGSA MAJU

4. LRT SRI RAMPAI



Sunday, February 7, 2021

LRT KLCC KJ10 Link to Petronas Tower and Suria KLCC at Jalan Ampang

 

LRT KLCC KJ10 is located in centre of Kuala Lumpur. The highest ridership station under Rapid Rail Sendirian Berhad is also the most popular destination for local and foreign commuters. As one of 5 underground station in Kelana Jaya Line, LRT KLCC is an alternative mode of transport to ease congestion at Jalan Ampang.

LRT KLCC - Centre platform design


Platform Design


Platform 1 to LRT Gombak

Platform 2 to LRT Putra Heights


Started its operation in 1999, LRT KLCC KJ10 is just one kilometer from LRT Ampang Park KJ9 which is also located at busiest area in Jalan Ampang.

LRT KLCC location on Google map : https://goo.gl/maps/12oBrvRYCLL8EKnZ6


Concourse Level - location of token vending machine, toilets, prayer rooms, customer service office


LRT KLCC concourse level


Operating Hours - download PULSE. Starts its operation at 6 am daily

How to go to LRT KLCC? Click Moovit or download application from Google Play Store or Apple Play Store


LRT KLCC entrance to Suria KLCC


Suria linkway



READ ALSO : BEST KLCC TOURIST ATTRACTION Avenue K Mall

PRASARANA JOURNEY PLANNER

LRT KL SENTRAL

LRT AMPANG PARK

LRT DANG WANGI

LRT KL GATEWAY - UNIVERSITI KJ19

The Surian Tunnel is the best way to Petronas Tower. The divided pathway is convenience for customer to enter and exit from LRT concourse level.


LRT KLCC linkway to hub bas and Suria KLCC



There are bus hub on top of Jalan Ampang and in front of Suria KLCC. There are many buses provided at this bus hub. 


LRT KLCC linkway to Jalan Ampang hub bas 



Pathway to Suria lobby and bus hub

Related Post;





Suria KLCC lobby

LRT and Bus Link



Jalan Ampang bus stop

Friday, February 5, 2021

High Speed Rail (HSR) Jakarta - Bandung has completed 63.9%


Project name: Jakarta-Bandung High-speed Railway, Indonesia


Total length: 150 km


Contractor: CREC




Jakarta-Bandung High-speed Railway is a proposed project in Indonesia, connecting the capital city of Jakarta to the textile hub of Bandung.

China have been selected by the Indonesian Government over Japan to build the country’s first fast-train rail link.

Commencing in 2016, construction on the $5.5bn project will last for three years, with completion scheduled for 2019. The project will be developed by PT Kereta Cepat Indonesia China, a joint venture formed in October 2015 between a consortium of Indonesian state-owned companies, and China Railway International.

The project will be carried out on a business-to-business basis, with Indonesia having 60% interest in the joint venture, while China has 40%.



Railway developer PT Kereta Cepat Indonesia China (KCIC) completed tunnelling on the 1.8km Tunnel 1 beneath the Jakarta – Cikampek toll road on December 15, The Jakarta Post reports. The tunnel is the fifth to be completed, KCIC president, Mr Chandra Dwiputra, said in a statement.

“With this tunnel completion, our tunnel drilling work progress has reached 74.94% of the total tunnel length of 16km,” he says. KCIC is planning to complete two more tunnels over the next two months.


The 350km/h line is included in the government’s national strategic projects (PSN), and will serve four main stations: Halim in Jakarta, Karawang in West Java, and Walini and Tegaluar in Bandung. The Jakarta – Bandung journey time will be cut from three hours to 45 minutes.

The project has faced a number of issues during construction. The Public Works and Housing Ministry halting work for two weeks after drainage problems caused flooding on the Jakarta – Cikampek toll road. The project has also faced land acquisition issues.

Indonesia’s president, Mr Joko Widodo, had planned to combine the Chinese-led project with the Japanese-led Jakarta – Surabaya project in order to stem the projects prolonged delays and budget overruns.

KCIC has moved back the completion date to the second half of 2021 from the initial target of June 2021, which was already two years later than the original date.

IRJ, 30 Dec, 2020


Photo Jakarta Post


READ ALSO : LRT KJ 17 ABDULLAH HUKUM


MRT PY06 Sri Damansara Barat More Park N Ride Facilities

MRT PY06 Sri Damansara Barat is a one of station under MRT Putrajaya Line. Started its operation in 16th June 2022, the extension of MRT lin...